March 17 - CTAAR closed, CAC Power Outage

A damaged electrical transformer will be repaired on Friday, March 17. This will cause a power outage to part of the College Avenue Campus, including the Rutgers Student Center, College Avenue Gym and surrounding buildings. It will also affect networking and  telephone services to several buildings.

The CTAAR office will remain closed until power is restored, and the CTAAR  web site will be unavailable.

Electrical service will be restored sometime after 5:00 pm, but it may take several more hours to restart servers and re-establish network services. We hope to have our web site back online by Saturday morning at the latest, and the office will reopen on Monday.

About this Entry

This page contains a single entry by Joseph Delaney published on March 15, 2017 11:13 AM.

SIRS Pilot in evaluationKit was the previous entry in this blog.

SIRS results for Fall 2016 posted is the next entry in this blog.

Find recent content on the main index or look in the archives to find all content.

Monthly Archives

Pages

Powered by Movable Type 5.2.13